    Construction time: June 2015

    Project name: Hainan Province West Ring high-speed railway fire Protection

    Company name: Wuhan Kaimei

    Project content: 2 sets of HFC-2propane fire extinguishing system

    Project Area: 1. Fire protection application of high-speed railway

    Project consumption:

    Total area of system protection: 6951m²

    Total dosage of HFC-227ea in the system: 4041kg


    Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-track Class I electrified passenger and cargo railway with a designed speed of 200 kilometers per hour. It is reported that the Hainan West Ring railway project in accordance with the approved design content, the main project has been basically completed, to complete the conditions. According to relevant regulations on railway construction, the static acceptance of the project began on August 1. Next, let's understand what the stations of Hainan West Ring Railway are respectively.

    Hainan West Ring Railway: It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.

    Hainan West Ring Railway station 1

    According to the latest news report, by the end of July, Hainan West Ring railway roadbed, bridge and culvert, tunnel main works have been completed; The track engineering has been completed, and the fine ramming and adjustment is planned to be completed by the end of August. The "Four power" project has been completed, and the installation and commissioning of each subsystem will be completed by the end of August. Environmental protection facilities and water and soil conservation facilities have been completed simultaneously with the main project, as have labor, safety, health and fire protection facilities.

    It is understood that the Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-line Class I electrified passenger and cargo common line railway with a designed speed of 200 kilometers per hour for passenger trains. It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.

    Haikou Station, Dongfang Station and Sanya Station do not need to build new, only need to expand the original platform and configuration of relevant facilities, then, the three railway stations will be sold at the same time, high-speed railway train tickets and ordinary train tickets, convenient travel.

    海南西环铁路站点1

    According to the latest news report, by the end of July, Hainan West Ring railway roadbed, bridge and culvert, tunnel main works have been completed; The track engineering has been completed, and the fine ramming and adjustment is planned to be completed by the end of August. The "Four power" project has been completed, and the installation and commissioning of each subsystem will be completed by the end of August. Environmental protection facilities and water and soil conservation facilities have been completed simultaneously with the main project, as have labor, safety, health and fire protection facilities.

    It is understood that the Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-line Class I electrified passenger and cargo common line railway with a designed speed of 200 kilometers per hour for passenger trains. It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.

    Haikou Station, Dongfang Station and Sanya Station do not need to build new, only need to expand the original platform and configuration of relevant facilities, then, the three railway stations will be sold at the same time, high-speed railway train tickets and ordinary train tickets, convenient travel.

     