Guangzhou Rong 'an Fire Equipment Co., LTD
Mr. Chen's telephone number:13928768802
Mr. Huang's telephone number:13711155165
Landline telephone:Landline telephone:020-31143089
Fax:020-31143992
E-mail:1851885478@qq.com
Website:http://www.gzrongan.net
Address: 15 Yongfeng Road, Shawan Town, Panyu District, Guangzhou City, Guangdong Province
Construction time: June 2015
Project name: Hainan Province West Ring high-speed railway fire Protection
Company name: Wuhan Kaimei
Project content: 2 sets of HFC-2propane fire extinguishing system
Project Area: 1. Fire protection application of high-speed railway
Project consumption:
Total area of system protection: 6951m²
Total dosage of HFC-227ea in the system: 4041kg
Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-track Class I electrified passenger and cargo railway with a designed speed of 200 kilometers per hour. It is reported that the Hainan West Ring railway project in accordance with the approved design content, the main project has been basically completed, to complete the conditions. According to relevant regulations on railway construction, the static acceptance of the project began on August 1. Next, let's understand what the stations of Hainan West Ring Railway are respectively.
Hainan West Ring Railway: It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.
Hainan West Ring Railway station 1
According to the latest news report, by the end of July, Hainan West Ring railway roadbed, bridge and culvert, tunnel main works have been completed; The track engineering has been completed, and the fine ramming and adjustment is planned to be completed by the end of August. The "Four power" project has been completed, and the installation and commissioning of each subsystem will be completed by the end of August. Environmental protection facilities and water and soil conservation facilities have been completed simultaneously with the main project, as have labor, safety, health and fire protection facilities.
It is understood that the Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-line Class I electrified passenger and cargo common line railway with a designed speed of 200 kilometers per hour for passenger trains. It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.
Haikou Station, Dongfang Station and Sanya Station do not need to build new, only need to expand the original platform and configuration of relevant facilities, then, the three railway stations will be sold at the same time, high-speed railway train tickets and ordinary train tickets, convenient travel.
According to the latest news report, by the end of July, Hainan West Ring railway roadbed, bridge and culvert, tunnel main works have been completed; The track engineering has been completed, and the fine ramming and adjustment is planned to be completed by the end of August. The "Four power" project has been completed, and the installation and commissioning of each subsystem will be completed by the end of August. Environmental protection facilities and water and soil conservation facilities have been completed simultaneously with the main project, as have labor, safety, health and fire protection facilities.
It is understood that the Hainan West Ring Railway starts from Haikou City in the north and ends in Sanya City in the south, with a total length of 345 kilometers. It is a double-line Class I electrified passenger and cargo common line railway with a designed speed of 200 kilometers per hour for passenger trains. It consists of Haikou Station (Haikou Changliu Town), Old Town Station (Chengmai), Lingao Station (Lincheng Town), Yangpu Station (Danzhou Guangcun Town), Baimajing Station (Danzhou Baimajing Town), Changjiang Station (Shiliangzhen Town), Dongfang Station (Dongsuo Town), Oriental Grateful City Airport Station (Ledongflo Town), Jiusuo Station (Ledong)- Yacheng Station (Sanya)- Sanya Phoenix Airport Station (Sanya Phoenix Town)- Sanya Station (Sanya) and other 13 stations.
Haikou Station, Dongfang Station and Sanya Station do not need to build new, only need to expand the original platform and configuration of relevant facilities, then, the three railway stations will be sold at the same time, high-speed railway train tickets and ordinary train tickets, convenient travel.
Copyright © 2015 www.gzrongan.net Guangzhou Rong 'an Fire Equipment Co., LTD All rights reserved
Contact: Mr. Chen Phone:13928768802 Mr. Huang Phone:13711155165 Tel:020-31143089 Fax:020-31143992 Email:1851885478@qq.com Address: 15 Yongfeng Road, Shawan Town, Panyu District, Guangzhou City, Guangdong Province Registration license No. :粤ICP备16114979号